Evaluation Peroid for Vistual Studio 2005 expiration

When I loaded the Team System Beta 2 VPC I got the following error after running twice.

The evaluation period for this copy has expired. Windows cannot start. To continue using Windows please purchase and install a retail copy of the product.

Software expires May 1, 2006?

How do I get the Beta to run?

Larry Langer

[324 byte] By [ndomain] at [2007-12-17]
# 1
The beta 3 VPC image is currently making its way through the MSDN plumbing should be available shortly (if it's not already).

There was a problem in the beta 2 VPC that resulted in expiring sooner than advertised.

Beta 3 is a huge improvement over beta 2.

Buck

BuckHodges at 2007-9-9 > top of Msdn Tech,Visual Studio Team System,Visual Studio Team System - General...

Visual Studio Team System